Topo
<View Full Size PDF>

Record of Survey
<View Full Size PDF>
|
Client:
Peter and Trish May
Locality: Yarrow Point Waterfront
Date completed: June 2002
Time for completion: 7 days
Type of survey: Boundary and Topographic Survey
Description: Survey for newly purchased home which was valued
at $ 7.1million. Included Lake Washington waterfront and 2nd Class
shorelands. Client required high level of detail for proposed remodeling.
|
|
|
Client:
Anita Kressner
Locality: Bellevue
Date completed: August 2001
Time for completion: 4 days
Architect: Lane Williams Architects
Type of survey: Boundary and Topographic Survey
Description: Survey of 3 sites for a new home construction. Sites
were thick with brush and steep. Survey of all significant trees was
carried included. |
|
|
Client:
McNally Family Trust
Locality: Fall City, Raging River
Date completed: August 2001
Time for completion: 4 days
Type of survey: Boundary and Topographic Survey with Elevation
Certificate
Description: Client approached MXP to survey property within
5 days so as not to delay closing. A detailed survey including elevation
certificate was completed within the very tight deadline. |
|
|
Client: ASI Construction
Locality: Snoqualmie
Date completed: November 2001
Time for completion: 5 days
Type of survey: Boundary and Topographic Survey
Description: Construction on site was being delayed due
to topographical survey requirement. Site was 60% covered by 10'
high blackberry. Survey was completed within deadline and construction
was completed.
|
|

Survey
<View Full Size PDF>

Short Plat
<View Full Size PDF>
|
Client:
Rachel Gagner
Locality: Bellevue
Date completed: September 2001
Time for completion: 4 days (from survey to submittal)
Jurisdiction: City of Bellevue
Type of survey: Short Plat
Description: A subdivision of a lot in the heart of Bellevue.
The survey unearthed a large encroachment over the client's property. |
|
|
Client:
Ray Coffman
Locality: Stanwood
Date completed: December 2001
Time for completion: 6 days (from survey to submittal)
Jurisdiction: Snohomish County
Type of survey: Boundary Line Adjustment
Description: Client wished to sell one of his two lots on
the lake. Unfortunately one of his houses encroached over the property
line and was delaying the marketing of the property. A tight schedule
was adhered to In completing the Boundary Line Adjustment (BLA) |
|
|
Client:
Ed and Mary Lou Higgins
Locality: Burien
Date completed: December 2001
Time for completion: 7 days (from survey to submittal)
Jurisdiction: City of Burien
Type of survey: Boundary Line Adjustment
Description: Client was selling property when an encroachment
was discovered. Needed the Boundary Line Adjustment to be completed
and approved by the City of Burien to avoid delay in closing. Deadline
was met and property closed. |
|
|
Client:
Shelly Inman
Locality: Snoqualmie
Date completed: August 2001
Time for completion: 4 days Jurisdiction: City of Snoqualmie
Type of survey: Boundary Line Adjustment
Description: Construction on this business lot was halted
when the client ran into coverage issues. The problem was resolved
by a Boundary Line Adjustment on the properties. Construction was
completed on schedule. |
|
|
Client:
Coulter Group
Locality: Kirkland
Date completed: October 2000
Time for completion: 6 days
Type of survey: ALTA / ACSM Description: The survey
was completed for the expansion of the Kirkland Honda dealership.
The site, although fairly flat was crossed by numerous easements and
a stream. |
|
|
Client:
Boucher Family Trust
Locality: Sammamish
Date completed: January 2002
Time for completion: 5 days
Type of survey: ALTA / ACSM Description: The Trust
had a purchaser for this waterfront property on Beaver Lake. There
were some concerns about the dwelling being very close to the property
line. Survey was completed within 5 days and the closing was not delayed.
|